20/5/25

While I did the overdue strimming, Mum opened Beds 2, 8 and 11. I need to get them planted/sown and we’ve got a little rain coming, so it’ll be a good thing to have the rain hit the soil, not the plastic. All the buckets are out in expectation of a miracle downpour.

The pond is now completely full thanks to another jerry can of well water. The couple of patches of linter showing are meant to be covered by greenery in time, so I’m pretty pleased with everything being level. The big side stones in the bird bowl had slipped, so I’ve  swapped them over, putting them at the bottom, with the paddlestone on top.